Implementation

The key to any successful implementation and deployment is planning. Our methodology is to plan backwards from the desired result to the starting point, segmenting each step into its own project.

This allows for realistic timelines, with the necessary testing and quality control being involved in each step sign off.

This methodology allows the subcontracted work to be completed prior to installation of the enterprise infrastructure equipment, ensuring arrival in a clean, correct environment for the final stages of implementation.

Further to this, and through our longstanding relationships with our distribution partners, we are able to create an environment in an ISO 9000 SABS approved centre for the necessary testing to take place prior to deployment. This centre is capable of containing a 100 device network and has been essential in completing the necessary testing required in ‘quick deployment’ scenarios, or temporary DR site needs.

Intelligent Business Solutions

Tel: (011) 540 7925 Tel: (011) 513 4179 Fax: (011) 540 7920